Cyber Resilience Act
European Union
GlobeRanger keeps an accurate record of the spares, tools, and equipment that keep essential services running, including the condition of each item. It keeps working even where there is no network.

Critical infrastructure is held up by equipment that is invisible until it is needed:
Every one of them is dormant, which is exactly why the record decays. A spare is quietly used elsewhere, a tool is not returned, an emergency item passes its date, and none of it is noticed until the moment it matters most.
GlobeRanger reads the tags on that stock and maintains one record of where each item is, who holds it, and what condition it is in. A spare drawn from the store, or an inspection nearing its due date, raises an exception while there is still time to act.
It runs at the edge, so tracking continues in technical buildings, tunnels, and unmanned sites without a live network connection, and integrates with the systems you already use.

Trade fairs, deadlines and standards that matter for this industry.
European Union
Berlin, Germany
Essen, Germany
Two operations with the same problem, in different buildings.

A German defence manufacturer stores ammunition and explosives in former bunkers, hazard classes 1.1 to 1.4. Each bunker has its own installation. Stock is confirmed by scanning, with no connection to the outside and without anyone counting by hand.
The customer has asked not to be named.

Baker Hill Industries runs GlobeRanger to track precision machined components in real time as they move through manufacturing. What carries over is the discipline of knowing where a critical item is at every step, not only when it was received.
No operator runs GlobeRanger for this purpose today. The first one will define what this product does here, and that definition is made in the boot camp, on one real site type, rather than borrowed from another sector.
A video call with the GlobeRanger team. One question: does GlobeRanger fit your operation?
One to three days on site. We work out which stock carries the risk, whether it starts with critical spares, tools, or emergency equipment, and what a pilot would cover.
A trial run on your own use case, at one site or on one class of asset. Where the site is closed or off network, the pilot runs offline from the first day.
The rollout across sites and the maintenance organisation, scoped and priced on what boot camp and pilot made concrete.
The first step costs 13 minutes.
